Whats next ?

Posted by on May 21, 2009 in CHESTNUT CABIN | 0 comments

The painting is almost done inside with just the trim to get finished. The shower floors are done with the river rocks , the wood floors should be going down in the next 2 weeks, Tubs will be installed shortly, we are working on the railings around the porches ….. we are getting things done !!!!

Read More

Cabin #2 looks out over the pasture

Posted by on May 21, 2009 in CHESTNUT CABIN | 0 comments

Cabin #2 looks out over the pasture

Read More